S T U
S
TERM
|
DEFINITION
|
Scheduler
|
The tool used to confirm when a reactive or quoted Work Order should be undertaken. It displays Building and contractor availability and any restrictions on specific dates
|
Serial Number (Asset)
|
The manufacturers unique alpha-numerical value associated to a specific equipment
|
Site Value (PPM)
|
This is the calculated cost which uses the number of invoices expected and the invoice value to determine what the cost is for each Building for this PPM task
|
Size Code
|
Size code that can be used to categorise your Buildings
|
SLA
|
Service Level Agreement. This is an agreement which is made with a Resource or a site with regards to a certain area of support
|
SLR
|
Service Level Requirement
|
SRA
|
Scope and Resource Allocation- Allocation of specific Resource against a set of Buildings and Work Order type criteria, to aid the helpdesk in Work Order assignment
|
SRA Description
|
This is freeform field to enter a description of what this SRA is
|
SRA for PPM purposes only
|
If this is ticked then this SRA will only apply to PPM Work Orders, and will have no relevance on any reactive Work Orders
|
SRA Name
|
This is a freeform field to enter the name of your SRA
|
SRA Unique Reference
|
This is a system generated reference for this SRA
|
Start Date
|
This is a date field in which you stipulate the date at which you want something to begin
|
State
|
This is the current point in a workflow which an object has reached
|
Status
|
This is the point of a workflow which an object has reached
|
Status (Assets)
|
Denotes the operational status of the Asset. For Example, working, out of service
|
Status (Finance)
|
Pre-defined list to denote the stage at which an invoice is held. For Example, pending approval, processed for payment
|
Status Change Reason (Assets)
|
A specific reason as to why the status of an Asset has changed
|
Still Available (Capital Budgets)
|
This is the amount of your capital budget which you still have available and have not allocated to a capex code
|
Sub Cost Code
|
Unique alpha-numerical value associated to the cost of a Building
|
Sub Equipment Type
|
A specific part which is associated or directly linked to a larger item of equipment. For Example, pumps within a sprinkler system.
|
Sub WO Type
|
A specific naming or category which defines a group of similar works. For Example, Electrical, Security
|
Subordinate Part
|
A specific part associated to an Asset which isn't Asset tagged but needs to be identified and recorded
|
Subscriptions
|
These are a list of important items which a Building contact may want to be informed about. You have the ability to add these to a contact, and so when a Work Order is flagged as this subscription type then this contact will be notified
|
Supplier
|
Person(s) responsible for delivery only of goods to site. A type of Resource
|
Symptoms
|
The observational and more specific reason why a reactive Work Order is being raised. For Example, doors stuck, no power.
|
T
TERM
|
DEFINITION
|
T&Cs Signed?
|
This allows you to show on a contract whether the physical T&Cs have been signed or not
|
T&Cs Type
|
This allows you to show on a contract which T&Cs were signed
|
Task (PPM)
|
This is the work which will be undertaken on the PPM Work Order. This is a concatenation of the Work Order Type, Sub Work Order Type, Equipment Type and the Reason for the PPM
|
Tax Type Code
|
Unique numerical value to identify Tax amount/procedure applicable (see www.hmrc.gov.uk for more information)
|
Temp-Fix By
|
The best Temp-Fix By Service Level possible for a Work Order, as calculated by the SRA/Contract Settings
|
Time zone
|
A time zone is a region of the earth that has uniform standard time, usually referred to as the local time.
|
Total Sales Surface Area
|
Result of combined floor space measurements dedicated to sales
|
Total Surface Area
|
Result of combined floor space measurements
|
Town
|
When entering an address of a Building or a Resource, this is the field where you enter the town they are based in
|
Trading
|
Business at Building being conducted
|
Trading Date
|
Official date from which business at Building commenced
|
Type of Work Order
|
This is the categorisation of Work Orders and the reason why they have been raised. These are Operation, Non-Operational, Quote, Audit and PPM
|
U
TERM
|
DEFINITION
|
UD fields
|
UD fields are User defined fields. There are 5 of these per Building, Resource and Asset, and they enable you to enter key information which could not be entered in any of the predefined fields
|
Under Warranty?
|
This should be ticked if an Asset is under warranty
|
Up To (Work Order Scheduler)
|
Set in the Scheduler as the Scheduled Start Date with no set Scheduled Finish date. Achievement of Service Level is based on Resource attending any time up until (before) this time
|
Upper Case? (RFI)
|
If this is ticked then you are allowing upper case to be used in the answers given to an RFI
|
User
|
The person(s) using the system
|
Username
|
Unique alpha-numerical value associated to a User
|